Termite Inspection Report - Termite Protection - Termite
Baiting |
|
Fumapest Termite & Pest Control ..... Since 1964
|
|
|
Summary of your TERMITE CONTROL options |
|
|
|
|
|
HOME-OWNERS who find signs of termite activity inside their home have several options for professional protection from continued termite infestation and timber damage in the building.
Initial Inspection & Report to A.S.3660 - thorough inspection of all buildings and surrounds - written report to Australian Standard 3660 - areas inspected - evidence found of termite activity - disclosure possible termite entry areas inaccessible to inspection - termite control options and limitations.
|
|
|
Chemical Soil Treatment around the perimeter and sub-floor of a building - to eradicate termites attempting
to gain entry into the building - complete barrier not always practicable - best long term protection option in vast majority of situations - Termidor or Premise termiticides are recommended.
|
|
|
Termite Baiting - installation and monitoring of termite bait stations - Nemesis, Exterra and Sentricon termite baits. This method relies heavily on the termites "finding"
and consuming sufficient bait. Recommended in some limited circumstances, particularly to areas where live termites are found.
|
|
|
Building Modification & Maintenance - termite risk reduction measures - may include improving subfloor ventilation - removal of timber in contact with the soil - improving inspection access areas.
|
|
|
Subsequent Inspections to A.S.3660 - essential - at least
at 3 to 6 months intervals where signs of termite activity has been previously located close by susceptible buildings or timber structures. |
|
|
|
|
|
Termite Inspection Report - Australian Standard 3660 |
|
|
|
|
|
It is essential first and foremost to obtain thorough
inspection of the buildings and surrounds, and obtain a written inspection report and detailed specifications to A.S.3660 for
an integrated termite control program. It is essential that the inspection
and report be received and considered in detail before any protective measures are commenced.
The cost - a professional termite inspection and report to A.S.3660 will cost around $200 to $300 for an average size residential building,
depending upon style of construction and ease of inspection access.
|
|
|
|
A professional termite inspection and report .... could save you thousands of dollars
Specific areas inspected should include all accessible timbers within the crawl space in the sub-floor, roof void, interior, exterior, garden landscaping, fences, other timber structures and trees in the locality. |
|
|
|
|
|
|
|
|
|
Your home insurance will NOT cover termite damage to structural and decorative timbers inside a residential or commercial property, which could be severe.
FUMAPEST has Professional indemnity insurance to cover future termite damage to structural and decorative timbers in a building after we have carried out a complete soil treatment service to AS 3660.
Termites in the building at the time of chemical soil treatment cannot safely return to their central colony nest through the chemically
treated soil. Termites usually return every few days to their central
underground to obtain moisture essential for their survival
and to feed and groom other
termites.
Expert knowledge and
specialised equipment is required to form a complete and continuous barrier to protect
the building from a termite entry and infestation - as illustrated below: |
|
|
|
|
|
Trench and treat soil around external concrete slab edge - a common
termite entry point
|
Trench and treat soil around walls and piers in the sub-floor area
|
Use rod injection to treat soil along and around the external perimeter
area of the building
|
|
|
|
Drill concrete floor along all expansion joints and cracks, and treat
soil thereunder
|
Drill concrete floor around pipes and treat soil thereunder
|
Drill concrete patio areas and treat soil area therein - a high risk
termite nest location
|
|
|
|
|
|
|
|
Termites sometimes nest inside a building - in a roof or wall cavity where moisture
is regularly supplied - such as from a faulty plumbing, leaking shower recess, broken
roof tiles and faulty guttering.
Termatrac termite detection equipment is used by FUMAPEST where we suspect a termite sub-nest is present inside a building |
|
|
|
|
|
|
Pesticide Safety Issues re: Soil Treatment Termiticides
|
|
|
|
|
|
Termite control chemicals are required to be assessed and approved by the Federal Govt agency APVMA
- for example - soil treatment termiticides - Termidor - Premise - Biflex - Dursban - and termite baits - Nemises - Exterra - Sentricon.
Solvent based termiticides are NOT used by FUMAPEST as such products may cause immediate health problems for people with asthmatic or bronchial ailments.
|
Water based - Termidor and Premise are the safer effective alternatives. Both are water based, have virtually no smell and of ultra-low hazard to humans, dogs, cats and other mammals.
Termidor termiticide is manufactured by BASF, and Premise termiticide by Bayer two of the world's most respected chemical companies. |
|
|
|
|
|
Termidor and Premise do NOT have an obnoxious odour or emit airborne residues or fumes. Both
are registered as a low hazard insecticide with a CAUTION notation on the
registered label.
|
Fipronil is the active ingredient in Termidor. Fipronil
is also in the Frontline flea and tick control product used on millions
of cats and dogs in Australia and the USA.
Termidor and Premise represent
modern technology and are NOT in the older style organo-chlorine
or organo-phosphate pesticide group. |
|
|
|
Avoid repellency products: Some alternative termiticides have a strong repellency action to deter
foraging termites. Repellant products are less effective in that the termites can detect the chemical and avoid it and move
along the treated soil areas, actively seeking a gap to gain entry into
the building.
Non-repellant products, such as Termidor and Premise
are more effective, in that the termites cannot avoid what they cannot detect. The chemical adheres to the skin of the worker termites or they ingest it when tunneling through treated soil areas.
These products have a delayed lethal effect - enough time to be taken back to the colony nest and be spread to other termites during their mutual feeding and grooming. With sufficient consumption of the chemical, the entire colony is eliminated.
Premise has been used as soil treatment
against subterranean termites for more than ten years in Australia and the USA with excellent
results for long term termite control. FUMAPEST is not aware of any significant
problems with the effectiveness of Premise termiticide during this period.
Premise will act to kill termites, in the higher
concentration treated soil areas abutting the building. With Premise, termites
that forage in the lower concentrated treated soil areas, will become disorientated,
stop feeding, and are fatally diseased by natural fungi and micro-organisms
in the soil. |
|
|
Both Bayer Premise and BASF Termidor products are scientifically proven to be transferred from one affected termite to another. The technology is aimed at eradicating the queen termite and the entire colony - refer to the animated illustration below:
|
|
|
|
Termites
tunneling in the Premise or Termidor treated
soil area abutting the building (of high concentration - near the
point of application) are killed outright.
Termites tunneling
in the outer parts of a Premise or Termidor treated
soil area (of low concentration) will not detect the chemical which adheres
to their bodies and has a delayed lethal effect of several days - enough
time to be transferred back to the central colony nest.
Worker termites have a very thin waxy skin (called an exoskeleton) that readily
absorbs moisture.
Both Premise and Termidor adheres to the termite exoskeleton and is readily adsorbed
through the exoskeleton and into the termite's body to immobilize and kill the
affected termite within a few days.
In that time, the termites spread the Premise or Termidor chemical to other termites
during regular physical contact, particularly when working together in close
proximity, grooming and feeding the rest of the colony, a regular function of
their daily life.
Cannibals by nature: Termites carry away or cannibalize
other dead termites, further spreading the lethal effect of the Premise or Termidor
chemical throughout the colony. |
|
|
|
|
|
|
|
Termite Baits & Baiting
Systems |
|
|
|
|
|
Termite baits registered in Australia by the Australian Federal Government APVMA Registration Authority are Nemesis, Exterra and Sentricon brand of termite baits.
|
We recommend Nemesis as
the only AUSTRALIAN owned and developed product. Exterra and Sentricon
are USA owned termite bait products.
Each baiting system uses a number of plastic bait stations for in-ground and
above-ground installation where active termites have been located. |
How a termite bait works: Each termite bait contains an IGR chemical - that is an insect growth regulator - the Nemesis bait contains chlorfluazuron as the active constituent. The worker termites readily eat the bait and pass it onto other termites in the central nest as part of their mutual feeding and grooming process. Termites must regularly molt in their development from nymph to adult. The IGR is slow acting - enough time to spread it's deady effect to other termites in the colony.
A cascading lethal effect: The chemical prevents the termites from regrowing their external skeleton, resulting in the death of the termite. Termites cannibalize other dead termites thereby hastening the elimination of the entire colony.
Termites have acute survival instincts. The location of a toxic food source if detected, will be abandoned. Too much disturbance of the foraging termites (workers and soldiers) in a particular location, will alert the termite colony to abandon the area. The termites appear to be gone, but may in fact be entering the building in other areas. Your home is a much bigger bait station.
Regular monitoring is required: The Nemesis, Exterra and Sentricon termite baiting systems are subject to regular inspection and monitoring by the termite controller. The larger the number of termites that consume the bait, the quicker and more certain is the termite colony elimination process.
Baiting is sometimes unreliable: Termite colony elimination in favourable circumstances may take several
weeks to a few months. However, in some cases, termite colony elimination
is unsuccessful or may take years, depending on the circumstances.
It depends if a large number of termites find and consume the bait, then colony
elimination is virtually assured within a few months. The
experience and skill of the pest controller is paramount, in order to properly decide if
and where a baiting program is to be implemented and properly monitored.
WARNING: some pest controllers offer termite baiting at ridiculously low prices that does not cover direct materials and labour. BEWARE the pest control licensing system in NSW is inadequate. Some individuals have a NSW Govt WorCover pest control licence with little training or experience.
Consumer note: It is usual to reinspect the bait stations and the buildings and surrounds
every month to reposition, reapply or replenish the bait, if necessary. This process is labour intensive so that the
long term cost of the monitoring and baiting system may accumulate out of
hand before the chance of success or otherwise, is realised.
|
|
|
|
Ring the Experts: successful termite protection of a building using a baiting program often requires expert skill and judgment, based upon years of field-work experience in termite control in a wide variety of circumstances.
Live termites found? One critical aspect is the bait stations should to installed in areas where live activity is found. Otherwise the termites must blindly "find" the stations to have any
chance of bait consumption and successful elimination. |
|
|
CONSUMER NOTICE: Be wary of companies want full payment upfront that promise a timber replacement warranty using a termite baiting and monitoring system.
Be careful to read the Contract fine print which stipulates that the so called "warranty"
may or may NOT apply at some future point in time when the company decides at it's descretion that the termite colony elimination is successful.
|
|
|
|
No absolute guarantee: With a termite baiting program, there can be no absolute guarantee of long-term protection of nearby buildings. There may be other termite nests nearby the building that do not find the bait stations.
Your home is a much bigger bait station. Other termite nests may exist in trees, under concrete on-ground flooring and in-fill patios of neighboring properties. These termite nest may be unaffected by the baiting program..
If termites happen to 'find" the in-ground "monitoring" stations,
the a bait is placed therein. If this involves sufficient disruption of the termites
may avoid the in-ground bait station, entirely. |
RECOMMENDATION: FUMAPEST apply the Nemesis Termite Bait directly onto known termite activity areas. The rate and amount of consumption is monitored for several weeks. In addition, if practicable thereafter, a complete chemical soil barrier treatment using Termidor or Premise be applied around the immediate perimeter of the building and other high risk entry points.
AN INTEGRATED APPROACH: A termite monitoring and baiting program can be integrated with a range
of methods including (1) drilling susceptible trees and eradication of any
termite nest located therein, and (2) in conjunction with a follow up chemical
soil treatment using Termidor or Premise. |
|
|
|
|
|
Building
Modifications & Maintenance
|
|
|
|
|
|
Listed below are some useful recommendations for the home-owner to carry out in order to help reduce the risk of undetected termite activity inside a building.
Rapid termite colony development and building infestation is usually
associated with a readily available timber food and moisture source nearby
the central nest.
Buildings are often
constructed in a way that allow termites to gain undetectable entry from
the soil to the structural timbers of the building.
(1) Moisture exclusion from inside the wall cavities, around the base of the
building and sub-floor area. Exclude excessive water
run-off from a sub-floor area by the installation of ag-drains.
Make sure there is adequate cross flow ventilation in the sub-floor area.
In addition, a qualified plumber should be engaged to ensure there is no
water leakage from plumbing pipes in the bathroom, the shower recess, kitchen,
down pipes, guttering and air conditioning unit overflow. Look for signs
of dampness in the wall cavities, broken roof tiles, faulty guttering and
the like.
Please note: high humidity, dampness or moisture accumulating
in a wall cavity is of high risk to encouraging large scale termite activity
inside the building.
(2) Removal of any timber in contact with the soil. Timbers should be stored above ground level to allow full inspection for termite activity. Any landscaping using timber chip mulch and railway sleepers should be removed, as they provide ready food source to assist in rapid termite colony development.
(3) Ensure inspection access is unimpeded, particularly
in sub-floor areas of suspended floors, in order to look for evidence of termite
activity. If your home is on concrete slab on-ground flooring, make
sure you can inspect the entire external slab edge for evidence of termite
mud-shelter tubes. Do NOT allow this area to be covered by pavers, landscaping,
planter pots, etc, as termites often gain entry into the wall cavity through external weep holes and gaps in the mortar of brick-work.
If you find live termites DO NOT disturb the area. DO NOT use spray insecticides on the termites. If sufficiently disturbed, the termites may move elsewhere and not be rediscovered until severe damage has been done. The termite controller can install a termite bait on the termite activity area aimed at maximising bait consumption by the termites and elimination of the entire colony. |
|
|
|
|
|
Regular Follow-up Inspections & Monitoring |
|
|
|
|
|
|
CONSUMER NOTE: the installation of
a chemical soil barrier does not negate the need for regular competent
inspections - at least 3 to 6 months where the termite risk is high.
We usually recommend 3 or 6 monthly inspections be carried for the first 24 months
following a chemical soil treatment. |
A Word of Warning: the
correct identification of a destructive termite species, inspection of
a building for tell-tale signs, analysis of your circumstances and the
design and implementation of an effective program for the protection of
a building from termite infestations, requires expert skill and
judgment based upon professional training and extensive field-work
experience in termite control in a wide variety of circumstances. |
|
|
|
|
|
FUMAPEST Spider Identification Chart
|
|
|
For information on pest control - click on your problem pest
|
|
|